Intelligence for what gets built.

Explore your construction site as a living model. Compare BIM with reality, inspect every detail and measure directly in the model.

A line drawing of a multi-storey building with its services
The problem

Every building drifts from its drawings. A sleeve moves. A duct drops. By handover, nobody can say which one is true.

01 / 05 · Capture

Walk the site once.

The model is intent. The capture is fact. Put them on one screen and the difference is obvious.

02 / 05 · Compare

See what moved.

Lay the model over what is actually there, and see which one moved, and by how much.

03 / 05 · Measure

Measure from your desk.

The dimension you forgot to take is still there. Open the capture and measure it.

04 / 05 · Systems

Every system, separated.

1,847,036 elements separated and counted in a single corridor, with no one modelling any of them by hand.

Detected systems in one corridor

  • Pipes38,455
  • Fire33,588
  • AC / HVAC205,087
  • Cable trays380,366
  • Structure1,189,540

Fire, HVAC, plumbing and electrical. Each one isolated, each one counted, floor by floor.

05 / 05 · Time

Every scan is a date.

Close a wall in April. The March scan still shows what is behind it.